Description of Project: Cleaned, Repaired and painted 9 pole lighting system at the property.
Two rescreational style tennis courts were professionally prepped for our high tech Petro Mat System Repair.
After that process tack material was applied to the old surface with 1 1/2 inches of sports asphalt was addedand left to sit for a 30 day curing period. We then applied our 4 coat resurfacing process, painted net posts and provided/installed two new tidi court waste baskets to complete the project.